MK FACTORY WASTE WATER TREATMENT SYSTEM
CAPACITY 30M3/ DAY NIGHT
Address: VSIP, Bac Ninh
Contract package: Design, process the body and install.
System handover time: November 2021
Output water quality: VSIP Bac Ninh.
Johkasou tank is under concrete road
Operation room is made of steel mesh and inside motobike parking
Perspective picture
Lift down tank