Domestic wastewater treatment system of Daiwa plastic factory
Posted 25/07/2019- Domestic wastewater treatment system of Daiwa plastic factory uses: MBBR Fudeso Johkasou according to Japanese Johkasou standard.
- The project is located at Thang Long III IP- Vinh Phuc.
- Design, supply, install equipment for wastewater treatment system.
- Completed in 2019.
Investor: Daiwa Plastics Thang Long Co., Ltd
Address: Thang Long III IP- Vinh Phuc
Contract package: Design, supply, install equipment for wastewater treatment system.
Completion date: 2019
Discharge standard: TLIP III Standard
Treatment technology: MBBR Fudeso Johkasou according to Japanese Johkasou standard.

Figure1: Daiwa Plastics Thang Long Factory

Figure 2: Domestic wastewater treatment system of Daiwa Plastics Thang Long factory
What technology does the project use?
Domestic wastewater treatment system of Daiwa plastic factory uses: MBBR Fudeso Johkasou according to Japanese Johkasou standard.
Where was the project carried out?
The project is located at Thang Long III IP- Vinh Phuc.
What did FUDESO deliver?
Design, supply, install equipment for wastewater treatment system.
When was the project completed?
Completed in 2019.