Hotline (+84) 24 3206 3222[email protected]
Domestic wastewater treatment system of Kuwana Viet Nam factory

Domestic wastewater treatment system of Kuwana Viet Nam factory

Posted 29/07/2019
Quick summary
  • Domestic wastewater treatment system of Kuwana Viet Nam factory uses: MBBR Fudeso Johkasou according to Japanese Johkasou standard.
  • The project is located at Dong Van III IP, HA NAM.
  • Design, supply, install equipment for wastewater treatment system.
  • Completed in 2019.

Investor: KUWANA HA NAM Co., Ltd
Address: Dong Van III IP, HA NAM
Contract package: Design, supply, install equipment for wastewater treatment system.
Completion date: 2019
Discharge standard: Dong Van III Standard
Treatment technology: MBBR Fudeso Johkasou according to Japanese Johkasou standard.


DOMESTIC WASTEWATER TREATMENT SYSTEM OF KUWANA VIET NAM FACTORY

DOMESTIC WASTEWATER TREATMENT SYSTEM OF KUWANA VIET NAM FACTORY

What technology does the project use?

Domestic wastewater treatment system of Kuwana Viet Nam factory uses: MBBR Fudeso Johkasou according to Japanese Johkasou standard.

Where was the project carried out?

The project is located at Dong Van III IP, HA NAM.

What did FUDESO deliver?

Design, supply, install equipment for wastewater treatment system.

When was the project completed?

Completed in 2019.

Request a consultation

A FUDESO engineer will get back to you soon to discuss and arrange a site survey.

Hotline (+84) 24 3206 3222
Get directions

ZaloConsult