Hotline (+84) 24 3206 3222[email protected]
Domestic wastewater treatment system in Toyota Boshoku Ha Noi plant

Domestic wastewater treatment system in Toyota Boshoku Ha Noi plant

Posted 01/11/2016
Quick summary
  • Domestic wastewater treatment system in Toyota Boshoku Ha Noi plant has a capacity of 100 m³.
  • Domestic wastewater treatment system in Toyota Boshoku Ha Noi plant uses: Jokaso Fudeso MBBR in accordance with Japanese Jokaso standard.
  • The project is located at Phuc Yen Town, Vinh Phuc Province.
  • Design, construction and installation.
  • Completed in April 2017.

Domestic wastewater treatment system in Toyota Boshoku Ha Noi plant, capacity 100m³. day and night



Investor: Toyota Boshoku Ha Noi Co., Ltd.
Address: Phuc Yen Town, Vinh Phuc Province
Contract Package: Design, construction and installation
Performance time: March 2017
Completion Time: April 2017
Quality of output water: QCVN - 14/2008 collumn A
Treatment Technology: Jokaso Fudeso MBBR in accordance with Japanese Jokaso standard.

Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội


Figure 1: Toyota Boshoku Ha Noi Plant

Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội

Figure 2: Construction of Composite tank

Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội

Figure 3: Lifting and lowering tank in installation site, anchoring cable

Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội

Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội

Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội

Figure 4: Work completed and operated
Hệ thống xử lý nước thải sinh hoạt nhà máy Toyota Boshoku Hà Nội

Figure 5: Taking after-treatment water sample

What is the treatment capacity of this project?

Domestic wastewater treatment system in Toyota Boshoku Ha Noi plant has a capacity of 100 m³.

What technology does the project use?

Domestic wastewater treatment system in Toyota Boshoku Ha Noi plant uses: Jokaso Fudeso MBBR in accordance with Japanese Jokaso standard.

Where was the project carried out?

The project is located at Phuc Yen Town, Vinh Phuc Province.

What did FUDESO deliver?

Design, construction and installation.

When was the project completed?

Completed in April 2017.

Request a consultation

A FUDESO engineer will get back to you soon to discuss and arrange a site survey.

Hotline (+84) 24 3206 3222
Get directions