

Tam Chuc Pagoda and Resort wastewater system treatment
Posted 08/11/2022- Tam Chuc Pagoda and Resort wastewater system treatment has a capacity of 400 m³/day night.
- Tam Chuc Pagoda and Resort wastewater system treatment uses: Mobile microbiological media MBR.
- The project is located at Kim Bang, Ha Nam.
- Design, fabricate and installation.
- Completed in November 2022.
Waste water treatment system for Tam Chuc pagoda and resort
Capacity 400m³/ day night
Address: Kim Bang, Ha Nam
Contract package: Design, fabricate and installation.
System handover time: Nov 2022
Output water quality: Cột A, QCVN 14:2008/BTNMT.
Treatment technology: Mobile microbiological media MBR




Perspective image of the 320m3/day and night monastery area





Treatment plant


Operation room


Control cabinet

Un-loading tank


Reception area with capacity of 80m3/day and night

Results of water quality analysis after treatment

Toray MBR membrane

Membrane cleaning
Video demonstration:
View more:
Toray flatsheet membrane
Aska Food Factory
What is the treatment capacity of this project?
Tam Chuc Pagoda and Resort wastewater system treatment has a capacity of 400 m³/day night.
What technology does the project use?
Tam Chuc Pagoda and Resort wastewater system treatment uses: Mobile microbiological media MBR.
Where was the project carried out?
The project is located at Kim Bang, Ha Nam.
What did FUDESO deliver?
Design, fabricate and installation.
When was the project completed?
Completed in November 2022.
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.
Hotline (+84) 24 3206 3222

