ABB Factory (New PGTR) domestic wastewater system treatment

ABB Factory (New PGTR) domestic wastewater system treatment

Posted 08/11/2022
Quick summary
  • ABB Factory (New PGTR) domestic wastewater system treatment has a capacity of 83 m³/day night.
  • ABB Factory (New PGTR) domestic wastewater system treatment uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Tien Son, Bac Ninh.
  • Design and install.
  • Completed in December 2022.

ABB (new PGTR) factory waste water treatment system

Capacity 83m³/ day night

General construction contractor: Tuan Le Group

Address: Tien Son, Bac Ninh

Contract package: Design and install.

System handover time: December 2022

Output water quality: Class A, QCVN 14:2008/BTNMT.

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

ABB Factory (New PGTR) domestic wastewater system treatment

ABB Factory (New PGTR) domestic wastewater system treatment

ABB Factory (New PGTR) domestic wastewater system treatment

See also:

Showa valve project

Wastewater treatment tank for Sao Khue primary school

ASTI project

What is the treatment capacity of this project?

ABB Factory (New PGTR) domestic wastewater system treatment has a capacity of 83 m³/day night.

What technology does the project use?

ABB Factory (New PGTR) domestic wastewater system treatment uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Tien Son, Bac Ninh.

What did FUDESO deliver?

Design and install.

When was the project completed?

Completed in December 2022.