  • Eiwo Rubber domestic wastewater system treatment has a capacity of 30 m³/day night.
  • Eiwo Rubber domestic wastewater system treatment uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Hoa Mac IP, Ha Nam.
  • Design, process the body and install.
  • Completed in August 2022.

Eiwo rubber factory waste water treatment system

Capacity 30m³/ day night

General construction contractor: Tokyu Construction Co., Ltd
Address: Hoa Mac IP, Ha Nam

Contract package: Design, process the body and install.

System handover time: August 2022

Output water quality: Hoa Mac IP, Ha Nam

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Eiwo Rubber domestic wastewater system treatment

Eiwo Rubber domestic wastewater system treatment

Eiwo Rubber domestic wastewater system treatment

See also:

Hanacan Project

Yusen Project

What is the treatment capacity of this project?

Eiwo Rubber domestic wastewater system treatment has a capacity of 30 m³/day night.

What technology does the project use?

Eiwo Rubber domestic wastewater system treatment uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Hoa Mac IP, Ha Nam.

What did FUDESO deliver?

Design, process the body and install.

When was the project completed?

Completed in August 2022.