Domesstic wastewater system treatment  for Nagoya Factory

Domesstic wastewater system treatment for Nagoya Factory

Posted 20/10/2023
Quick summary
  • Domesstic wastewater system treatment for Nagoya Factory has a capacity of 24 m³/day night.
  • Domesstic wastewater system treatment for Nagoya Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at VSIP - Nghe An.
  • Design, process the body and install.
  • Completed in 2/2023.


NAGOYA FACTORY's domestic wastewater treatment system

Capacity 24m³/ day night

Contract awarded by: Toyo ITC

Address: VSIP - Nghe An

Contract package: Design, process the body and install.

Completion time: 2/2023

Output water quality: VSIP - Nghe An

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Domesstic wastewater system treatment  for Nagoya Factory

Domesstic wastewater system treatment  for Nagoya Factory

Domesstic wastewater system treatment  for Nagoya Factory

Domesstic wastewater system treatment  for Nagoya Factory

System after 2 years

Domesstic wastewater system treatment  for Nagoya Factory

See also:

TKR Factory

TB Project

Toho Project

What is the treatment capacity of this project?

Domesstic wastewater system treatment for Nagoya Factory has a capacity of 24 m³/day night.

What technology does the project use?

Domesstic wastewater system treatment for Nagoya Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at VSIP - Nghe An.

What did FUDESO deliver?

Design, process the body and install.

When was the project completed?

Completed in 2/2023.

Request a consultation

A FUDESO engineer will get back to you soon to discuss and arrange a site survey.