SHIN ETSU MAGNETIC Factory Wastewater system treatment
Posted 27/07/2020- SHIN ETSU MAGNETIC Factory Wastewater system treatment has a capacity of 7 m³/day.
- SHIN ETSU MAGNETIC Factory Wastewater system treatment uses: MBBR Fudeso Johkasou according to Japanese Johkasou standard.
- The project is located at Dinh Vu IP, Hai Phong city.
- Design, supply, install equipment for wastewater treatment system.
- Completed in 06/2020.
WASTE WATER TREATMENT SYSTEM OF SHIN-ETSU MAGNETIC VIET NAM FACTORY
Capacity: 7m3/day
Investor: Shin Etsu Magnetic Vietnam Co., LTD.
Address: Dinh Vu IP, Hai Phong city.
Contract package: Design, supply, install equipment for wastewater treatment system.
Completion date: 06/2020
Discharge standard: Dinh Vu IP standard
Treatment technology: MBBR Fudeso Johkasou according to Japanese Johkasou standard.

What is the treatment capacity of this project?
SHIN ETSU MAGNETIC Factory Wastewater system treatment has a capacity of 7 m³/day.
What technology does the project use?
SHIN ETSU MAGNETIC Factory Wastewater system treatment uses: MBBR Fudeso Johkasou according to Japanese Johkasou standard.
Where was the project carried out?
The project is located at Dinh Vu IP, Hai Phong city.
What did FUDESO deliver?
Design, supply, install equipment for wastewater treatment system.
When was the project completed?
Completed in 06/2020.