Posted 19/05/2017- Domestic wastewater treatment system in Suzukaku plant has a capacity of 13 m³.
- Domestic wastewater treatment system in Suzukaku plant uses: Jokaso Fudeso MBBR in accordance with Japanese Jokaso standard.
- The project is located at Ba Thien Industrial Zone no.II, Binh Xuyen District, Vinh Phuc Province.
- Design, construction and installation.
- Completed in September 2014.
Domestic wastewater treatment system in Suzukaku plant, capacity 13m³. day and night
Investor: Suzukaku Vietnam Co., Ltd.
Address: Ba Thien Industrial Zone no.II, Binh Xuyen District, Vinh Phuc Province
Contract Package: Design, construction and installation
Performance time: July 2014
Completion Time: September 2014
Quality of output water: QCVN - 14/2008 collumn B
Treatment Technology: Jokaso Fudeso MBBR in accordance with Japanese Jokaso standard.


Figure 1. Suzukaku Plant


Figure 2. Wastewater treatment system in Suzukaku Plant

Figure 3. Gas Blower machine and central gas distribution system

Figure 4. After-treatment water sample
What is the treatment capacity of this project?
Domestic wastewater treatment system in Suzukaku plant has a capacity of 13 m³.
What technology does the project use?
Domestic wastewater treatment system in Suzukaku plant uses: Jokaso Fudeso MBBR in accordance with Japanese Jokaso standard.
Where was the project carried out?
The project is located at Ba Thien Industrial Zone no.II, Binh Xuyen District, Vinh Phuc Province.
What did FUDESO deliver?
Design, construction and installation.
When was the project completed?
Completed in September 2014.