Quick summary
  • PH Neutralization system for B-Braun factory has a capacity of 2 m³/hr.
  • PH Neutralization system for B-Braun factory uses: Chemical and physical technology.
  • The project is located at Thanh Oai - Ha Noi.
  • Design, supply equipment and install.
  • Completed in 4/2023.


pH neutralization syste, in B-Braun factory

Capacity: 2m³/hr

Address: Thanh Oai - Ha Noi

Contract package: Design, supply equipment and install.

Completion time: 4/2023

Output water quality: 6 < pH < 8
Processing technology: Chemical and physical technology.

PH Neutralization system for B-Braun factory

PH Neutralization system for B-Braun factory

See more:

Wastewater treatment tank for food processing factory

Wastewater treatment tank for livestock and chicken hatchery

What is the treatment capacity of this project?

PH Neutralization system for B-Braun factory has a capacity of 2 m³/hr.

What technology does the project use?

PH Neutralization system for B-Braun factory uses: Chemical and physical technology.

Where was the project carried out?

The project is located at Thanh Oai - Ha Noi.

What did FUDESO deliver?

Design, supply equipment and install.

When was the project completed?

Completed in 4/2023.