Posted 20/10/2023- PH Neutralization system for B-Braun factory has a capacity of 2 m³/hr.
- PH Neutralization system for B-Braun factory uses: Chemical and physical technology.
- The project is located at Thanh Oai - Ha Noi.
- Design, supply equipment and install.
- Completed in 4/2023.
pH neutralization syste, in B-Braun factory
Capacity: 2m³/hr
Address: Thanh Oai - Ha Noi
Contract package: Design, supply equipment and install.
Completion time: 4/2023
Output water quality: 6 < pH < 8
Processing technology: Chemical and physical technology.


See more:
Wastewater treatment tank for food processing factory
Wastewater treatment tank for livestock and chicken hatchery
What is the treatment capacity of this project?
PH Neutralization system for B-Braun factory has a capacity of 2 m³/hr.
What technology does the project use?
PH Neutralization system for B-Braun factory uses: Chemical and physical technology.
Where was the project carried out?
The project is located at Thanh Oai - Ha Noi.
What did FUDESO deliver?
Design, supply equipment and install.
When was the project completed?
Completed in 4/2023.
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.
Hotline (+84) 24 3206 3222