On-site wastewater treatment equipment for AT factory

On-site wastewater treatment equipment for AT factory

Posted 03/12/2025
Quick summary
  • On-site wastewater treatment equipment for AT factory has a capacity of 10 m³/day night.
  • On-site wastewater treatment equipment for AT factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Dong Nai.
  • Design, fabrication and install.
  • Completed in Oct, 2025.


AT Factory 's on-site domestic wastewater treatment equipment

Capacity 10m³/ day night

Address: Dong Nai.

Contract package: Design, fabrication and install.

Completion time: Oct, 2025

Output water quality: Long Duc IP, Dong Nai.

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

On-site wastewater treatment equipment for AT factory

On-site wastewater treatment equipment for AT factory

On-site wastewater treatment equipment for AT factory

On-site wastewater treatment equipment for AT factory

See more:

Wastewater treatment tank project for power plant No. 02

NTL project

What is the treatment capacity of this project?

On-site wastewater treatment equipment for AT factory has a capacity of 10 m³/day night.

What technology does the project use?

On-site wastewater treatment equipment for AT factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Dong Nai.

What did FUDESO deliver?

Design, fabrication and install.

When was the project completed?

Completed in Oct, 2025.