A packaged sewage treatment plant (STP) is quoted on data, not on a catalogue number. This checklist lists what a buyer should know, and what a supplier should ask for, before a price is compared.

This page summarises public sources and FUDESO product information. It is not legal advice; check current official texts before design or procurement.

1. Design data

TopicWhat to defineWhy it matters
FlowAverage daily flow, peak factor, design population or occupancy (rooms, staff, visitors)Sets tank volume and blower size
Influent qualityBOD5, COD, suspended solids, ammonia or total nitrogen, fats, oils and grease, pH, temperatureSets the process and any pretreatment
SalinitySalinity, TDS and chlorides of the water supply and of the wastewater (brackish flush water, groundwater infiltration)Affects biological performance and material choice
Effluent targetDischarge or reuse category and its limits (BOD, suspended solids, nutrients, coliform, residual chlorine)Decides MBBR, MBR and disinfection
SiteAvailable space, buried or above ground, groundwater level, traffic loads, access for desludging trucksBuried tanks need anti-flotation design; above-ground FRP needs UV protection
ClimateMaximum and minimum ambient temperature, sun exposureAssessed project by project
Power and controlsVoltage and frequency, backup power, alarms, remote monitoringBlower and pump selection, control panel
PretreatmentScreens; grease trap or separator for kitchensProtects the biological stage
OperationDesludging frequency, operator training, spare parts, O&M contract, local agentTotal cost of ownership

2. Documents to request from a supplier

  • Process description and design calculation, with the design flow, loads and the effluent quality it can hold.
  • General arrangement drawing with tank dimensions, inlet and outlet levels, manholes and weights.
  • Equipment datasheets: blowers, pumps, control panel, and for MBBR the media or for MBR the membranes (manufacturer data).
  • Materials information for the tank (for example FRP laminate, wall thickness) and installation requirements.
  • Conditions of any performance guarantee, and the commissioning and testing procedure.
  • Operation and maintenance manual, spare-parts list, warranty terms and references.
  • Any conformity or certification documents required for import into the country of use (confirm with the authority or a notified body).

3. Commercial points

  • Delivery terms (Incoterms), scope of installation and commissioning, and who supplies civil works.
  • For public tenders in Oman, registration with the Tender Board and the local content (In-Country Value) plan may apply; many foreign suppliers work through a local agent. Check the tender documents of each buyer.
  • Effluent licence: the owner usually applies for the discharge licence; see Oman discharge rules.

See also packaged STP options (MBBR and MBR) and grease separation for kitchens.

Send us your project data

Share the items in the checklist through the contact form and our engineers will propose a system size and configuration. Hotline: (+84) 24 3206 3222.

Request a consultation

A FUDESO engineer will get back to you soon to discuss and arrange a site survey.

Hotline (+84) 24 3206 3222
Get directions

ZaloConsult