Hotline (+84) 24 3206 3222[email protected]
Brand New medical wastewater treatment system (Kyaw Hospital)

Brand New medical wastewater treatment system (Kyaw Hospital)

Posted 11/08/2026
Quick summary
  • Brand New medical wastewater treatment system (Kyaw Hospital) has a capacity of 5 m³/day.
  • Design, body shell fabrication and commercial equipment supply.
  • Completed in March 2026.


Wastewater treatment system for Kyaw hospital
Capacity: 5 m³/day

Export order no. 21

Contract Package: Design, body shell fabrication and commercial equipment supply.
Completion Time: March 2026
Effluent Quality: Complies with Myanmar National Discharge Standards
Model: FS-SM-25P
Quantity: 1 set of 5 m³/day (FS-SM-25P)
Packaging: 1 × 40HC Container
Production Time: 2 months
Shipping Time: 1 month

Brand New medical wastewater treatment system (Kyaw Hospital)

See more:
Win Sammering Hospital Project
Pyi Kaw Hospital Project

What is the treatment capacity of this project?

Brand New medical wastewater treatment system (Kyaw Hospital) has a capacity of 5 m³/day.

What did FUDESO deliver?

Design, body shell fabrication and commercial equipment supply.

When was the project completed?

Completed in March 2026.

Request a consultation

A FUDESO engineer will get back to you soon to discuss and arrange a site survey.

Hotline (+84) 24 3206 3222
Get directions

ZaloConsult