

Brand New medical wastewater treatment system (Kyaw Hospital)
Posted 11/08/2026- Brand New medical wastewater treatment system (Kyaw Hospital) has a capacity of 5 m³/day.
- Design, body shell fabrication and commercial equipment supply.
- Completed in March 2026.
Wastewater treatment system for Kyaw hospital
Capacity: 5 m³/day
Export order no. 21
Contract Package: Design, body shell fabrication and commercial equipment supply.
Completion Time: March 2026
Effluent Quality: Complies with Myanmar National Discharge Standards
Model: FS-SM-25P
Quantity: 1 set of 5 m³/day (FS-SM-25P)
Packaging: 1 × 40HC Container
Production Time: 2 months
Shipping Time: 1 month

See more:
Win Sammering Hospital Project
Pyi Kaw Hospital Project
What is the treatment capacity of this project?
Brand New medical wastewater treatment system (Kyaw Hospital) has a capacity of 5 m³/day.
What did FUDESO deliver?
Design, body shell fabrication and commercial equipment supply.
When was the project completed?
Completed in March 2026.
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.
Hotline (+84) 24 3206 3222

