

Wastewater Treatment System for Win Sammering Hospital
Posted 11/08/2026- Wastewater Treatment System for Win Sammering Hospital has a capacity of 20 m³/day.
- Design, body shell fabrication and commercial equipment supply.
- Completed in December 2024.
Wastewater treatment system for Win Sammering hospital
Capacity: 20 m³/day
Export order no. 17
Contract Package: Design, body shell fabrication and commercial equipment supply.
Completion Time: December 2024
Effluent Quality: Complies with Myanmar National Discharge Standards
Model: FS-AMN-100P
Quantity: 1 set of 20 m³/day (FS-AMN-100P)
Packaging: 1 × 40HC Container
Production Time: 2 months
Shipping Time: 1 month

See more:
Madalar Hospital
Shan State Hospital
What is the treatment capacity of this project?
Wastewater Treatment System for Win Sammering Hospital has a capacity of 20 m³/day.
What did FUDESO deliver?
Design, body shell fabrication and commercial equipment supply.
When was the project completed?
Completed in December 2024.
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.
Hotline (+84) 24 3206 3222

