Domestic wastewater system treatment for FJY Factory
Posted 23/07/2025- Domestic wastewater system treatment for FJY Factory has a capacity of 60 m³/day night.
- Domestic wastewater system treatment for FJY Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
- The project is located at Long An.
- Design, fabrication and install.
- Completed in Dec, 2025.
FJY 's domestic wastewater treatment system
Capacity 60m³/ day night
Address: Long An.
Contract package: Design, fabrication and install.
Completion time: Dec, 2025
Output water quality: Huu Thanh IP, Long An.
Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.





COD treatment efficiency 94%
See also:

What is the treatment capacity of this project?
Domestic wastewater system treatment for FJY Factory has a capacity of 60 m³/day night.
What technology does the project use?
Domestic wastewater system treatment for FJY Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
Where was the project carried out?
The project is located at Long An.
What did FUDESO deliver?
Design, fabrication and install.
When was the project completed?
Completed in Dec, 2025.