Domestic wastewater system treatment for VHD Factory
Posted 12/04/2025- Domestic wastewater system treatment for VHD Factory has a capacity of 16.8 m³/day night.
- Domestic wastewater system treatment for VHD Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
- The project is located at Hai Duong.
- Design, process the body and install.
- Completed in March, 2025.
VHD FACTORY's domestic wastewater treatment system
Capacity 16.8m³/ day night
Address: Hai Duong.
Contract package: Design, process the body and install.
Completion time: March, 2025
Output water quality: Class B, QCVN 40:2011/BTNMT
Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.








Results of water quality analysis after treatment
See also:
What is the treatment capacity of this project?
Domestic wastewater system treatment for VHD Factory has a capacity of 16.8 m³/day night.
What technology does the project use?
Domestic wastewater system treatment for VHD Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
Where was the project carried out?
The project is located at Hai Duong.
What did FUDESO deliver?
Design, process the body and install.
When was the project completed?
Completed in March, 2025.