Showa Valve Vung Tau domestic wastewater treatment system

Showa Valve Vung Tau domestic wastewater treatment system

Posted 03/12/2025
Quick summary
  • Showa Valve Vung Tau domestic wastewater treatment system uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Vung Tau.
  • Design and install.
  • Completed in 11/2024.


SHOWA VUNG TAU 's domestic wastewater treatment system

Capacity 6 m3/ day night

Address:Vung Tau.

Contract package: Design and install.

Completion time: 11/2024

Output water quality: Phu My 3 IP, Ba Ria, Vung Tau.

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Showa Valve Vung Tau domestic wastewater treatment system

Showa Valve Vung Tau domestic wastewater treatment system

Showa Valve Vung Tau domestic wastewater treatment system

Showa Valve Vung Tau domestic wastewater treatment system

Showa Valve Vung Tau domestic wastewater treatment system

Showa Valve Vung Tau domestic wastewater treatment system

Results of analysis of wastewater quality after treatment

See also:

Sumida Project

ABB Project

Showa Valve Vung Tau domestic wastewater treatment system

What technology does the project use?

Showa Valve Vung Tau domestic wastewater treatment system uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Vung Tau.

What did FUDESO deliver?

Design and install.

When was the project completed?

Completed in 11/2024.