Posted 07/05/2026- Wastewater treatment system for car washes exported to Cambodia POCBDB02 has a capacity of 5 m³/day-night.
- Design, fabrication of tank body/shell, and supply of commercial equipment.
- Completed in 1 month (04/2026).
Export Order – Wastewater Treatment Tank for Automobile Factory to Cambodia POCBDB02
Capacity: 5 m³/day-night
Export Order No.: POCBDB02
Contract Package: Design, fabrication of tank body/shell, and supply of commercial equipment.
Completion Time: 1 month (04/2026)
Effluent Quality: Meets the national wastewater discharge standards of the Kingdom of Cambodia.
Model: FS-S-50P
Quantity: 1 set of 5 m³ (FS-S-50P), 1 grease trap FS-GTH-10
Packing: 1 unit of 14 m flatbed trailer (transport by road to SoNguon Border Gate, Bavet, Cambodia)
Production Time: 1 month
Transportation Time: 2 days












See more:
What is the treatment capacity of this project?
Wastewater treatment system for car washes exported to Cambodia POCBDB02 has a capacity of 5 m³/day-night.
What did FUDESO deliver?
Design, fabrication of tank body/shell, and supply of commercial equipment.
When was the project completed?
Completed in 1 month (04/2026).
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.
Hotline (+84) 24 3206 3222