Livestock wastewater system treatment  for BHD Factory Cambodia

Livestock wastewater system treatment for BHD Factory Cambodia

Posted 03/12/2025
Quick summary
  • Livestock wastewater system treatment for BHD Factory Cambodia has a capacity of 60 m³/day/night.
  • Livestock wastewater system treatment for BHD Factory Cambodia uses: Coagulation, Flocculation, aerotank.
  • The project is located at Cambodia.
  • Design and install.
  • Completed in Dec 2025.


Livestock wastewater treatment system

BHD Cambodia factory

Capacity 60m³/day/night

Address: Cambodia

Contract package: Design and install.

Completion time: Dec 2025

Output water quality: National discharge standard of Cambodia.
Processing technology: Coagulation, Flocculation, aerotank.

Livestock wastewater system treatment  for BHD Factory Cambodia

Livestock wastewater system treatment  for BHD Factory Cambodia

Livestock wastewater system treatment  for BHD Factory Cambodia

Livestock wastewater system treatment  for BHD Factory Cambodia

Livestock wastewater system treatment  for BHD Factory Cambodia
Livestock wastewater system treatment  for BHD Factory Cambodia

See also:

Belga Livestock Wastewater Treatment System

Wastewater Treatment Projects Exported to Myanmar

What is the treatment capacity of this project?

Livestock wastewater system treatment for BHD Factory Cambodia has a capacity of 60 m³/day/night.

What technology does the project use?

Livestock wastewater system treatment for BHD Factory Cambodia uses: Coagulation, Flocculation, aerotank.

Where was the project carried out?

The project is located at Cambodia.

What did FUDESO deliver?

Design and install.

When was the project completed?

Completed in Dec 2025.