Domesstic wastewater system treatment for FT Pharma Factory
Posted 20/10/2023- Domesstic wastewater system treatment for FT Pharma Factory has a capacity of 6 m³/day night.
- Domesstic wastewater system treatment for FT Pharma Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
- The project is located at Long An.
- Design, process the body and install.
- Completed in 3/2023.
FT PHARMA FACTORY's domestic wastewater treatment system
Capacity 6m³/ day night
Address: Long An
Contract package: Design, process the body and install.
Completion time: 3/2023
Output water quality: Class B, QCVN 40:2011/BTNMT
Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.



See also:
What is the treatment capacity of this project?
Domesstic wastewater system treatment for FT Pharma Factory has a capacity of 6 m³/day night.
What technology does the project use?
Domesstic wastewater system treatment for FT Pharma Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
Where was the project carried out?
The project is located at Long An.
What did FUDESO deliver?
Design, process the body and install.
When was the project completed?
Completed in 3/2023.