Domesstic wastewater system treatment  for FT Pharma Factory

Domesstic wastewater system treatment for FT Pharma Factory

Posted 20/10/2023
Quick summary
  • Domesstic wastewater system treatment for FT Pharma Factory has a capacity of 6 m³/day night.
  • Domesstic wastewater system treatment for FT Pharma Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Long An.
  • Design, process the body and install.
  • Completed in 3/2023.


FT PHARMA FACTORY's domestic wastewater treatment system

Capacity 6m³/ day night

Address: Long An

Contract package: Design, process the body and install.

Completion time: 3/2023

Output water quality: Class B, QCVN 40:2011/BTNMT

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Domesstic wastewater system treatment  for FT Pharma Factory

Domesstic wastewater system treatment  for FT Pharma Factory

Domesstic wastewater system treatment  for FT Pharma Factory

See also:

Moritex Project

Showa Valve Project

What is the treatment capacity of this project?

Domesstic wastewater system treatment for FT Pharma Factory has a capacity of 6 m³/day night.

What technology does the project use?

Domesstic wastewater system treatment for FT Pharma Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Long An.

What did FUDESO deliver?

Design, process the body and install.

When was the project completed?

Completed in 3/2023.