Showa Valve domestic wastewater system treatment

Showa Valve domestic wastewater system treatment

Posted 08/11/2022
Quick summary
  • Showa Valve domestic wastewater system treatment has a capacity of 6 m³/day night.
  • Showa Valve domestic wastewater system treatment uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Tan Truong IP, Hai Duong.
  • Design, fabricate FRP tank and install.
  • Completed in August 2022.

Moritex factory waste water treatment system

Capacity 6m³/ day night

General construction contractor: Toyo International Co., Ltd
Address: Tan Truong IP, Hai Duong

Contract package: Design, fabricate FRP tank and install.

System handover time: August 2022

Output water quality: Tan Truong IP, Hai Duong

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Showa Valve domestic wastewater system treatment

Showa Valve domestic wastewater system treatment

See also:

FT pharma project

Showa Sangyo project

Moritex project

What is the treatment capacity of this project?

Showa Valve domestic wastewater system treatment has a capacity of 6 m³/day night.

What technology does the project use?

Showa Valve domestic wastewater system treatment uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Tan Truong IP, Hai Duong.

What did FUDESO deliver?

Design, fabricate FRP tank and install.

When was the project completed?

Completed in August 2022.