Domestic wastewater treatment tank of MM factory
Posted 18/10/2025- Domestic wastewater treatment tank of MM factory has a capacity of 22 m³/day night.
- Domestic wastewater treatment tank of MM factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
- The project is located at Long An.
- Design, fabrication and install.
- Completed in Oct, 2025.
MM factory 's domestic wastewater treatment system
Capacity 22m³/ day night
Address: Long An.
Contract package: Design, fabrication and install.
Completion time: Oct, 2025
Output water quality: Class A, QCVN 40:2011/BTNMT.
Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.




See also:
What is the treatment capacity of this project?
Domestic wastewater treatment tank of MM factory has a capacity of 22 m³/day night.
What technology does the project use?
Domestic wastewater treatment tank of MM factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
Where was the project carried out?
The project is located at Long An.
What did FUDESO deliver?
Design, fabrication and install.
When was the project completed?
Completed in Oct, 2025.