Domestic wastewater system treatment  for WCV Factory

Domestic wastewater system treatment for WCV Factory

Posted 29/05/2025
Quick summary
  • Domestic wastewater system treatment for WCV Factory has a capacity of 30 m³/day night.
  • Domestic wastewater system treatment for WCV Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Dong Nai.
  • Design, process the body and install.
  • Completed in April, 2025.


WCV FACTORY's domestic wastewater treatment system

Capacity 30m³/ day night

Address: Dong Nai.

Contract package: Design, process the body and install.

Completion time: April, 2025

Output water quality: Long Thanh Hightech IP standard

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Domestic wastewater system treatment  for WCV Factory

Domestic wastewater system treatment  for WCV Factory

Domestic wastewater system treatment  for WCV Factory

Domestic wastewater system treatment  for WCV Factory

Domestic wastewater system treatment  for WCV Factory

Domestic wastewater system treatment  for WCV Factory

Domestic wastewater system treatment  for WCV Factory

Results of wastewater quality analysis after treatment

See also:

Tohken Project

YKK Project

What is the treatment capacity of this project?

Domestic wastewater system treatment for WCV Factory has a capacity of 30 m³/day night.

What technology does the project use?

Domestic wastewater system treatment for WCV Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Dong Nai.

What did FUDESO deliver?

Design, process the body and install.

When was the project completed?

Completed in April, 2025.