Posted 29/05/2025- Domestic wastewater system treatment for WCV Factory has a capacity of 30 m³/day night.
- Domestic wastewater system treatment for WCV Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
- The project is located at Dong Nai.
- Design, process the body and install.
- Completed in April, 2025.
WCV FACTORY's domestic wastewater treatment system
Capacity 30m³/ day night
Address: Dong Nai.
Contract package: Design, process the body and install.
Completion time: April, 2025
Output water quality: Long Thanh Hightech IP standard
Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.







Results of wastewater quality analysis after treatment
See also:
What is the treatment capacity of this project?
Domestic wastewater system treatment for WCV Factory has a capacity of 30 m³/day night.
What technology does the project use?
Domestic wastewater system treatment for WCV Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
Where was the project carried out?
The project is located at Dong Nai.
What did FUDESO deliver?
Design, process the body and install.
When was the project completed?
Completed in April, 2025.
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.
Hotline (+84) 24 3206 3222