Hotline (+84) 24 3206 3222[email protected]
Domestic wastewater system treatment  for YKK Factory

Domestic wastewater system treatment for YKK Factory

Posted 25/07/2025
Quick summary
  • Domestic wastewater system treatment for YKK Factory has a capacity of 40 m³/day night.
  • Domestic wastewater system treatment for YKK Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
  • The project is located at Ha Nam.
  • Design, fabrication and install.
  • Completed in Sep, 2023.


YKK 's domestic wastewater treatment system

Capacity 40m³/ day night

Address: Ha Nam.

Contract package: Design, fabrication and install.

Completion time: Sep, 2023

Output water quality: Dong Van 3 IP, Ha Nam.

Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.


Domestic wastewater system treatment  for YKK Factory

Domestic wastewater system treatment  for YKK Factory

Domestic wastewater system treatment  for YKK Factory

See more:

SLP Long Hau Project

VHD Project

What is the treatment capacity of this project?

Domestic wastewater system treatment for YKK Factory has a capacity of 40 m³/day night.

What technology does the project use?

Domestic wastewater system treatment for YKK Factory uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.

Where was the project carried out?

The project is located at Ha Nam.

What did FUDESO deliver?

Design, fabrication and install.

When was the project completed?

Completed in Sep, 2023.

Request a consultation

A FUDESO engineer will get back to you soon to discuss and arrange a site survey.

Hotline (+84) 24 3206 3222
Get directions

ZaloConsult