Yamashin factory domestic wastewater treatment system
Posted 10/05/2022- Yamashin factory domestic wastewater treatment system has a capacity of 48 m³/day night.
- Yamashin factory domestic wastewater treatment system uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
- The project is located at TLIP III - Vinh Phuc.
- Design, process the body and install.
- Completed in 12/2021.
YAMASHIN FACTORY's domestic wastewater treatment system
Capacity 48m³/ day night
Investor: Yamashin Vietnam Co., Ltd.
Address: TLIP III - Vinh Phuc.
Contract package: Design, process the body and install.
Completion time: 12/2021
Output water quality: TLIP III - Vinh Phuc
Processing technology: Johkasou Fudeso MBBR according to Japanese Johkasou standards.


Figure 1: Transportation and lifting of Composite tanks


Figure 2: Installation on site

Figure 3: Analysis results of water after treatment
See also:
What is the treatment capacity of this project?
Yamashin factory domestic wastewater treatment system has a capacity of 48 m³/day night.
What technology does the project use?
Yamashin factory domestic wastewater treatment system uses: Johkasou Fudeso MBBR according to Japanese Johkasou standards.
Where was the project carried out?
The project is located at TLIP III - Vinh Phuc.
What did FUDESO deliver?
Design, process the body and install.
When was the project completed?
Completed in 12/2021.