
Wastewater treatment for hospitals, clinics and health stations
FUDESO designs, fabricates and installs packaged medical wastewater treatment systems (FRP composite shell) using Johkasou MBR/MBBR technology for hospitals and clinics, in Vietnam and for export.
Wastewater from hospitals, clinics and health stations comes from toilets, laundry, kitchens and medical activities, and must be treated before discharge. Each facility differs in scale and installation site, so every system is designed to the project requirements.
FUDESO supplies packaged systems with a shell made of glass-fibre-reinforced composite (FRP), treating wastewater biologically with Johkasou MBR or MBBR technology. Many of FUDESO's medical projects are export orders to Myanmar.
FUDESO solutions for this sector
- Johkasou MBR: membrane bioreactor treatment, suited to higher output-quality requirements or limited installation space.
- Johkasou MBBR: moving-bed biofilm media for medium and large capacities.
- FRP tanks and composite fabrication: tank shells made to the facility's dimensions and installation position.
- Maintenance: keeping the system running reliably after handover.
Projects delivered
The list has 14 projects with capacities from 1.5 to 120 m³/day. The figures come from the project pages themselves.
Process
FUDESO surveys the site, designs to the project requirements, fabricates the FRP shell in its workshop, installs, commissions and provides maintenance after handover.
Frequently asked questions
What capacities has FUDESO built for medical wastewater treatment?
The 14 medical wastewater treatment projects published on this website range from 1.5 to 120 m³/day. The smallest is Wastewater treatment system of Win specialized clinic (1.5 m³/day); the largest is Brand new medical wastewater treatment system (wastewater treatment system for Tan Lac General Hospital) (120 m³/day).
Does FUDESO build for hospitals abroad?
Yes. Many medical projects belong to the export orders to Myanmar, for example Brand New medical wastewater treatment system (Mandalay Hospital) (75 m³/day, completed 10/2024), with output water meeting Myanmar's national discharge standards according to the project data.
How long does it take to install a Johkasou system?
According to FUDESO's documentation, installing a Johkasou system takes 2 to 30 days depending on the treatment scale. The exact schedule is agreed after the site survey.
What information do I need to provide for a consultation?
Tell FUDESO the facility type, the capacity or number of users, the province or city, and how to reach you (phone or email) through the consultation form or the hotline. A FUDESO engineer will get back to you to discuss and arrange a site survey.
Completed projects
All projects →

Brand New medical wastewater treatment system (Mandalar Hospital)

Brand New medical wastewater treatment system (Myat Taw Win Hospital)

Brand New medical wastewater treatment system (Royal Heart Hospital)

Brand New medical wastewater treatment system: Seitta Thukha hospital

Wastewater Treatment System for Win Sammering Hospital
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.
Hotline (+84) 24 3206 3222