Domestic wastewater treatment for factories and industrial parks
Systems for the domestic wastewater of workers, canteens and sanitary areas in factories, designed by FUDESO, with FRP shells fabricated and installed for many companies in industrial parks.
A factory with many workers produces a significant amount of domestic wastewater from toilets, canteens and washing areas, usually separate from production wastewater. FUDESO treats this domestic wastewater with packaged Johkasou systems installed inside the factory grounds.
The list below covers factories that use FUDESO systems. If the factory also has production wastewater or exhaust gas, FUDESO has separate solutions for each.
FUDESO solutions for this sector
- Johkasou: packaged on-site treatment installed within the factory grounds.
- Johkasou MBBR and Aerotank: biological treatment technologies for medium and large capacities.
- FRP tanks and composite fabrication: tank shells sized to the factory layout.
- Maintenance: stable operation after handover.
Projects delivered
The list has 15 projects with capacities from 5 to 83 m³/day. The figures come from the project pages themselves.
| Project | Capacity | Technology | Completed |
|---|---|---|---|
| ABB Factory (New PGTR) domestic wastewater system treatment | 83 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 12/2022 |
| Yamashin factory domestic wastewater treatment system | 48 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 12/2021 |
| Sumitomo Riko factory domestic wastewater treatment system | 48 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 01/2022 |
| Domesstic wastewater system treatment for Nagoya Factory | 24 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 02/2023 |
| Bambi factory domestic wastewater treatment system | 30 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 02/2022 |
| Eiwo Rubber domestic wastewater system treatment | 30 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 08/2022 |
| MK Domesstic wastewater system treatment | 30 m³/day night | Fudeso Johkasou MBBR per Japanese Johkasou standard | 12/2021 |
| Domestic Wastewater Treatment System for the Sakurai Factory | 17 m³/day | Johkasou Fudeso MBBR, compliant with Japanese Johkasou standards | 06/2024 |
| Domestic wastewater system treatment for Enplas Factory | 16 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 02/2023 |
| Domestic wastewater system treatment for Toho Factory | 16 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 02/2024 |
| SNT Domesstic wastewater system treatment | 13 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 11/2022 |
| Domesstic wastewater system treatment for FT Pharma Factory | 6 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 03/2023 |
| Moritex factory domestic wastewater system treatment | 7 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 11/2022 |
| Showa Valve domestic wastewater system treatment | 6 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 08/2022 |
| Domesstic wastewater system treatment for SKT Factory | 5 m³/day night | Johkasou Fudeso MBBR according to Japanese Johkasou standards | 12/2022 |
Process
FUDESO surveys the site, designs to the project requirements, fabricates the FRP shell in its workshop, installs, commissions and provides maintenance after handover.
Frequently asked questions
What capacities has FUDESO built for factory domestic wastewater?
The 15 factory domestic wastewater projects published on this website range from 5 to 83 m³/day. The smallest is Domesstic wastewater system treatment for SKT Factory (5 m³/day); the largest is ABB Factory (New PGTR) domestic wastewater system treatment (83 m³/day).
What about production wastewater and exhaust gas?
This page covers domestic wastewater. For production wastewater see <a href="/en/giai-phap/xu-ly-nuoc-thai-cong-nghiep/">industrial wastewater treatment</a>; for exhaust gas see <a href="/en/giai-phap/xu-ly-khi-thai/">exhaust gas treatment</a>. A FUDESO engineer will propose a suitable option after the survey.
How long does it take to install a Johkasou system?
According to FUDESO's documentation, installing a Johkasou system takes 2 to 30 days depending on the treatment scale. The exact schedule is agreed after the site survey.
What information do I need to provide for a consultation?
Tell FUDESO the facility type, the capacity or number of users, the province or city, and how to reach you (phone or email) through the consultation form or the hotline. A FUDESO engineer will get back to you to discuss and arrange a site survey.
Request a consultation
A FUDESO engineer will get back to you soon to discuss and arrange a site survey.