Hotline (+84) 24 3206 3222[email protected]
Home / Solutions / Domestic wastewater treatment for factories and industrial parks

Domestic wastewater treatment for factories and industrial parks

Systems for the domestic wastewater of workers, canteens and sanitary areas in factories, designed by FUDESO, with FRP shells fabricated and installed for many companies in industrial parks.

Domestic wastewater treatment for factories and industrial parks

A factory with many workers produces a significant amount of domestic wastewater from toilets, canteens and washing areas, usually separate from production wastewater. FUDESO treats this domestic wastewater with packaged Johkasou systems installed inside the factory grounds.

The list below covers factories that use FUDESO systems. If the factory also has production wastewater or exhaust gas, FUDESO has separate solutions for each.

FUDESO solutions for this sector

Projects delivered

The list has 15 projects with capacities from 5 to 83 m³/day. The figures come from the project pages themselves.

ProjectCapacityTechnologyCompleted
ABB Factory (New PGTR) domestic wastewater system treatment83 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards12/2022
Yamashin factory domestic wastewater treatment system48 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards12/2021
Sumitomo Riko factory domestic wastewater treatment system48 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards01/2022
Domesstic wastewater system treatment for Nagoya Factory24 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards02/2023
Bambi factory domestic wastewater treatment system30 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards02/2022
Eiwo Rubber domestic wastewater system treatment30 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards08/2022
MK Domesstic wastewater system treatment30 m³/day nightFudeso Johkasou MBBR per Japanese Johkasou standard12/2021
Domestic Wastewater Treatment System for the Sakurai Factory17 m³/dayJohkasou Fudeso MBBR, compliant with Japanese Johkasou standards06/2024
Domestic wastewater system treatment for Enplas Factory16 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards02/2023
Domestic wastewater system treatment for Toho Factory16 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards02/2024
SNT Domesstic wastewater system treatment13 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards11/2022
Domesstic wastewater system treatment for FT Pharma Factory6 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards03/2023
Moritex factory domestic wastewater system treatment7 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards11/2022
Showa Valve domestic wastewater system treatment6 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards08/2022
Domesstic wastewater system treatment for SKT Factory5 m³/day nightJohkasou Fudeso MBBR according to Japanese Johkasou standards12/2022

Process

FUDESO surveys the site, designs to the project requirements, fabricates the FRP shell in its workshop, installs, commissions and provides maintenance after handover.

Frequently asked questions

What capacities has FUDESO built for factory domestic wastewater?

The 15 factory domestic wastewater projects published on this website range from 5 to 83 m³/day. The smallest is Domesstic wastewater system treatment for SKT Factory (5 m³/day); the largest is ABB Factory (New PGTR) domestic wastewater system treatment (83 m³/day).

What about production wastewater and exhaust gas?

This page covers domestic wastewater. For production wastewater see <a href="/en/giai-phap/xu-ly-nuoc-thai-cong-nghiep/">industrial wastewater treatment</a>; for exhaust gas see <a href="/en/giai-phap/xu-ly-khi-thai/">exhaust gas treatment</a>. A FUDESO engineer will propose a suitable option after the survey.

Source: xu ly nuoc thai cong nghiep

How long does it take to install a Johkasou system?

According to FUDESO's documentation, installing a Johkasou system takes 2 to 30 days depending on the treatment scale. The exact schedule is agreed after the site survey.

Source: johkasou xu ly nuoc thai sinh hoat

What information do I need to provide for a consultation?

Tell FUDESO the facility type, the capacity or number of users, the province or city, and how to reach you (phone or email) through the consultation form or the hotline. A FUDESO engineer will get back to you to discuss and arrange a site survey.

Request a consultation

A FUDESO engineer will get back to you soon to discuss and arrange a site survey.

Hotline (+84) 24 3206 3222
Get directions

ZaloConsult